Trump’s Return to OPEC Politics Muddies Oil Talks Next Month
US President Donald Trump has raised the stakes for a meeting of an OPEC+ ministerial panel next month, with his call for the group to lower oil prices.
The 600,000 tonnes Prelude FLNG facility, the largest offshore facility ever constructed, is nearing completion at the Samsung Heavy Industries (SHI) shipyard in Geoje, South Korea.
Once completed, the floating liquefied natural gas (FLNG) facility will be moored off Western Australia for a period of 20 to 25 years where it will be used to chill natural gas produced at the Prelude field to –162°C (-260°F), shrinking its volume by 600 times so it can be exported to customers in Asia.
Once operational, the Prelude FLNG facility will produce at least 5.3 million tonnes (mtpa) per annum of liquids: 3.6 mtpa of LNG, 1.3 mtpa of condensate (equivalent to 35,000 bbl/d) and 0.4 mtpa of liquefied petroleum gas (LPG).
Here’s a look at its progress at SHI:
Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.
Join the 108,866 members that receive our newsletter.
Have a news tip? Let us know.
Maritime and offshore news trusted by our 108,866 members delivered daily straight to your inbox.
Essential news coupled with the finest maritime content sourced from across the globe.
Sign Up