Join our crew and become one of the 105,235 members that receive our newsletter.

World’s First Ship Tunnel to Bypass Norway’s Most Dangerous Waters

World’s First Ship Tunnel to Bypass Norway’s Most Dangerous Waters

Mike Schuler
Total Views: 4702
March 7, 2017

An illustration of the Stad Ship Tunnel. Image credit: Norwegian Coastal Administration

Norwegian officials have given the green light to fully finance what is set to become the world’s first full-scale ship tunnel, bypassing one of the most dangerous areas for vessels along the Norwegian coast.

The Stad Ship Tunnel will be blasted through 1.7 kilometers of rock at the narrowest point of the Stad Peninsula, allowing ships the size of Hurtigruten’s coastal steamers to navigate it.

What’s fascinating is that the tunnel isn’t expected to shave much time off the normal route, rather it is intended to allow ships to navigate more safely through the Stadhavet Sea, where the North and Norwegian seas meet. The Stadhavet Sea is considered one of the most exposed and dangerous areas for vessels along the coast of Norway, sometimes experiencing more than 100 storm days per year and a dangerous combination of wind, currents, and waves.

According to reports, 33 people have lost their lives in the area since the end of WWII.

kart-stad-skipstunnel-m-norgeskart
Location of the Stad Ship Tunnel (in yellow). Credit: Norwegian Coastal Administration

The Norwegian broadcaster NRK reports that the Norwegian government approved the full NOK 2.7 billion in funds needed for the project on March 2. The funding will be provided in two phases beginning in 2018 and lasting until 2029, according to NRK.

The Norwegian Coastal Administration, which is responsible for the project, says construction will involve conventional blasting using underground drilling rigs and pallet rigs, which will be used to remove approximately 3 million cubic meters of solid rock from the mountainside. 

The idea for a bypass route through Stad has been kicked around in Norway for decades, but the idea has picked up steam in the recent years following studies pinpointing the best route. In 2013, the Norwegian Parliament earmarked NOK 1 billion for the project in the final period of the National Transport Plan 2014-2023.

20298548403_ff2a38fa8e_k
Credit: Norwegian Coastal Administration 

Once completed, the Stad Ship Tunnel will be 1.7 kilometers long, 37 meters high and 26.5 meters wide. Construction time is estimated to be approximately 3 to 4 years, but overall the project could span more than a decade from its potential start date sometime after 2018.

In addition to providing a safer route for sailors, the tunnel is also expected to serve as a popular tourist attraction with the potential for an overhead bridge that will be open to the public. 

14802328520_ed5cf95a70_o

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.

Sign Up
Back to Main
polygon icon polygon icon

Why Join the gCaptain Club?

Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.

Sign Up
close

JOIN OUR CREW

Maritime and offshore news trusted by our 105,235 members delivered daily straight to your inbox.

Join Our Crew

Join the 105,235 members that receive our newsletter.