Successful Ocean Recovery Caps Historic SpaceX Mission
Billionaire Jared Isaacman and the Polaris Dawn crew made a triumphant return to Earth on Sunday, marking the end of a historic mission. The SpaceX Crew Dragon capsule splashed down...
The vessel is the first of four X-BOW® vessels for offshore shipowner CBO to be built at Alianca. After the launch, the superstructure was lifted onto the vessel and assembled in a smooth and problem-free operation.
CBO (Compania Brasileira de Offshore) ordered two PX106 and two PX105 designs from ULSTEIN at the end of 2009. The contracts include delivery of design, engineering, main equipment and building follow-up. The four PSVs are the first vessels with the X-BOW® to be constructed in Brazil. The vessels will enter into eight-year contracts, with options for extension, for the Brazilian state oil company Petrobas.
Via Ulstein
Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.
Join the 109,239 members that receive our newsletter.
Have a news tip? Let us know.
Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.
Sign UpMaritime and offshore news trusted by our 109,239 members delivered daily straight to your inbox.
Essential news coupled with the finest maritime content sourced from across the globe.
Sign Up