Join our crew and become one of the 110,142 members that receive our newsletter.

centennial j jurong shipyard

SPOTD: Centennial J Gets Set for Turret Installation at Jurong

Rob Almeida
Total Views: 45
October 21, 2014

Screengrab via YouTube

The VLCC Centennial J was selected by Tullow Oil for the Tweneboa-Enyenra-Ntomme (TEN) Project offshore Ghana where she is currently being converted into an FPSO at Jurong Shipyard.

In the above screenshot, her bow has been removed in preparation for the installation of the turret and swivel which will collect all the production fluids from the seabed and allow hydraulic and electric umbilicals to operate the subsea development.

The development consists of 24 production wells in waters 1,500 meters deep drilled by Seadrill’s 6th generation semi-submersible West Leo.

Installation of the FPSO is planned for 2015.

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.

Sign Up
Back to Main
polygon icon polygon icon

Why Join the gCaptain Club?

Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.

Sign Up
close

JOIN OUR CREW

Maritime and offshore news trusted by our 110,142 members delivered daily straight to your inbox.