Join our crew and become one of the 110,676 members that receive our newsletter.

“Pioneering Spirit” to Install Topsides Facilities at Johan Sverdrup

“Pioneering Spirit” to Install Topsides Facilities at Johan Sverdrup

Rob Almeida
Total Views: 40
March 2, 2015

Pieter Schelte arrives in Rotterdam, January 2015. Photo: KOTUG International B.V.

Statoil announced today they have signed a contract with Allseas to utilize the Pioneering Spirit (ex- Pieter Schelte) to install the drilling, processing and living quarter platforms at the Johan Sverdrup field. The Pioneering Spirit is the world’s largest heavy lift vessel with a lifting capacity of 48,000 tons.

The topsides will be assembled onshore and then transferred to the Pioneering Spirit for transport to the field.  Once on station, the topsides will be placed upon the installed steel jackets.

Statoil says the largest lift during this installation will be the processing platform of around 26,000 tons.

The drilling platform topsides will be installed in 2018, and the processing and living quarter topsides will follow in 2019.

Tags:

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.

Sign Up
Back to Main
polygon icon polygon icon

Why Join the gCaptain Club?

Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.

Sign Up
close

JOIN OUR CREW

Maritime and offshore news trusted by our 110,676 members delivered daily straight to your inbox.