An illustration of the Stad Ship Tunnel. Image credit: Norwegian Coastal Administration
Norwegian officials have given the green light to fully finance what is set to become the world’s first full-scale ship tunnel, bypassing one of the most dangerous areas for vessels along the Norwegian coast.
The Stad Ship Tunnel will be blasted through 1.7 kilometers of rock at the narrowest point of the Stad Peninsula, allowing ships the size of Hurtigruten’s coastal steamers to navigate it.
What’s fascinating is that the tunnel isn’t expected to shave much time off the normal route, rather it is intended to allow ships to navigate more safely through the Stadhavet Sea, where the North and Norwegian seas meet. The Stadhavet Sea is considered one of the most exposed and dangerous areas for vessels along the coast of Norway, sometimes experiencing more than 100 storm days per year and a dangerous combination of wind, currents, and waves.
According to reports, 33 people have lost their lives in the area since the end of WWII.
Location of the Stad Ship Tunnel (in yellow). Credit: Norwegian Coastal Administration
The Norwegian broadcaster NRK reports that the Norwegian government approved the full NOK 2.7 billion in funds needed for the project on March 2. The funding will be provided in two phases beginning in 2018 and lasting until 2029, according to NRK.
The Norwegian Coastal Administration, which is responsible for the project, says construction will involve conventional blasting using underground drilling rigs and pallet rigs, which will be used to remove approximately 3 million cubic meters of solid rock from the mountainside.
The idea for a bypass route through Stad has been kicked around in Norway for decades, but the idea has picked up steam in the recent years following studies pinpointing the best route. In 2013, the Norwegian Parliament earmarked NOK 1 billion for the project in the final period of the National Transport Plan 2014-2023.
Credit: Norwegian Coastal Administration
Once completed, the Stad Ship Tunnel will be 1.7 kilometers long, 37 meters high and 26.5 meters wide. Construction time is estimated to be approximately 3 to 4 years, but overall the project could span more than a decade from its potential start date sometime after 2018.
In addition to providing a safer route for sailors, the tunnel is also expected to serve as a popular tourist attraction with the potential for an overhead bridge that will be open to the public.
Greenland's parliament has unanimously backed a phased ban on discharges from ships' exhaust gas cleaning systems, adding another layer of environmental restrictions for vessels operating in Arctic waters and potentially affecting cruise operators using scrubbers to meet international emissions standards.
Norway has detained a Chinese-owned heavy-lift vessel sanctioned for its role in delivering equipment to Russia’s Arctic LNG 2 project, in what appears to be the first known detention in the Arctic of a Chinese vessel linked to Russia’s shadow fleet.
Norwegian authorities have seized a Russian-owned expedition ship in Svalbard at the request of Ukraine’s Naftogaz Group as the company seeks to enforce a $4.22 billion arbitration award against Russia...
September 2, 2026
Total Views: 3317
Get The Industry’s Go-To News
Subscribe to gCaptain Daily and stay informed with the latest global maritime and offshore news
— just like 106,093 professionals
Secure Your Spot
on the gCaptain Crew
Stay informed with the latest maritime and offshore news, delivered daily straight to your inbox
— trusted by our 106,093 members
Your Gateway to the Maritime World!
Essential news coupled with the finest maritime content sourced from across the globe.