Join our crew and become one of the 110,398 members that receive our newsletter.

troll c platform statoil

Troll C Platform Shut Down After Rusty Pipes Found

Rob Almeida
Total Views: 131
August 21, 2014

Troll C platform, Image (c) Øyvind Hagen – Statoil ASA

Since Sunday, Statoil’s Troll C floating process and accommodation platform has been shut down after an inspection revealed corrosion damage to a pipe connected to the oil export system.

Statoil expects the platform will lose 7 days of production while the corroded pipe is replaced. The company notes that this steel-hulled platform has a daily equity production of some 58,000 barrels of oil, and exports 8 million cubic meters of gas. In addition some 34,000 barrels of oil and 2 million cubic metres of gas are transported from the Fram field through the Troll C platform.

Tags:

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.

Sign Up
Back to Main
polygon icon polygon icon

Why Join the gCaptain Club?

Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.

Sign Up
close

JOIN OUR CREW

Maritime and offshore news trusted by our 110,398 members delivered daily straight to your inbox.