Join our crew and become one of the 110,527 members that receive our newsletter.

tensioned leg platform papa terra p-61 mcdermott

McDermott Finishes Papa Terra TLP Installation Offshore Brazil

Rob Almeida
Total Views: 79
April 10, 2014

Image: McDermott

McDermott International has announced the successful installation this week of the P-61 Tension Leg Wellhead Platform (TLWP) for the PPT BV Joint Venture, consisting of Petrobras and Chevron. Once fully commissioned and operational this platform will be the first to use dry-tree floating technology offshore Brazil and the first Tension Leg Platform installation offshore South America.

The TLP’s hull was designed by Floatec Singapore and built in Brazil by Keppel’s BrasFELS yard.  Fabrication of the piles and tendons was handled by McDermott.

Commissioning of the platform is ongoing and is under the direction of the FloaTEC project team.

McDermott utilized their recently upgraded deepwater construction vessel, Derrick Barge 50 (DB 50) to install the tendons.

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.

Sign Up
Back to Main
polygon icon polygon icon

Why Join the gCaptain Club?

Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.

Sign Up
close

JOIN OUR CREW

Maritime and offshore news trusted by our 110,527 members delivered daily straight to your inbox.