After separating Section One from the remaining wreck, the VB-10000 moved slowly and smoothly inside the EPB to a predetermined position for the Barge JULIE B transit underneath to receive the section. The wreck is surrounded by an environmental protection barrier with netting to the seafloor designed to catch large debris for removal. St. Simons Sound Incident response photo.

c915301d-36ae-4379-8498-9c229b005594

Mike Schuler
Total Views: 0
November 29, 2020

Back to Main