Join our crew and become one of the 105,925 members that receive our newsletter.

Ulstein’s ‘Northern Light’ Drilling Derrick

Ulstein’s ‘Northern Light’ Drilling Derrick

GCaptain
Total Views: 5
May 9, 2011

Last week at OTC in Houston, Ulstein Group introduced the ‘Northern Light’ drilling derrick, a new integrated derrick solution based on existing drilling equipment readily available in the market.

The ‘Northern Light’ drilling derrick offers an alternative solution based on proven and well known industry technologies to contractors and shipyards worldwide. The fully integrated derrick includes the drillfloor and substructure and can be transported, delivered and installed as one turnkey unit either from a shipyard.

The derrick consists of a box beam structure with a collapsible/retractable top part to pass bridges. Pipes, cables and elevator all run inside the derrick legs, allowing for a sheltered environment, reduced maintenance costs and increased safety. As such, the derrick is very suitable to be upgraded for arctic operations.

This new derrick design uses conventional drilling equipment readily available in the market, but because of its lay-out offers a clean drillfloor and much more operational flexibility as three operations can be simultaneously performed. This is achieved by having the BOP and riser string handling outside of the derrick as is the case for X’mas tree deployment. Stand / casing building is performed within the derrick.

Via Ulstein Group

Unlock Exclusive Insights Today!

Join the gCaptain Club for curated content, insider opinions, and vibrant community discussions.

Sign Up
Back to Main
polygon icon polygon icon

Why Join the gCaptain Club?

Access exclusive insights, engage in vibrant discussions, and gain perspectives from our CEO.

Sign Up
close

JOIN OUR CREW

Maritime and offshore news trusted by our 105,925 members delivered daily straight to your inbox.

Join Our Crew

Join the 105,925 members that receive our newsletter.