I have worked extensively with that system.
What did the operator try to change the draft to? It makes sense that there is a minimum. At zero draft you wouldn't have any props in the water, so you wouldnt be able to DP anyways! I wonder if when the system is initially configured if the minimum is a function of that vessels prop size...? S. |
|
||||
|
The operator changed the draft from 3.5 m to 4.6 m due to loading of weighted mud. But, there was not indication on the print out that the change was made. Only the 0.0 m draft change. As far as the initial set up, I do not know what it was.
|
|
|||
|
It sounds like a malfunction in the program.
Either that or operator error. S. |
![]() |